Newton, South Australia

The problem


Installing EV chargers in shopping centres has areas of concern and challenges, which include minimising power disruption during the centre's operating hours and ensuring existing facilities are not damaged.

The solution

After a site inspection, Quality Energy proposed the installation of a 120kW EV charger and using the hydro excavation method to reduce damages to existing services. Furthermore, MSB work on the switchboard was done after business hours to ensure the shopping centre could operate as usual without disruptions.

Benefits and Outcomes

Key equipment

  • 120kW Kempower EV Charger
  • Civil works

System size

120kW

Project warranty

Workmanship warranty: 2 years

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Share by: