Reservoir, Victoria
Reservoir, Victoria
Visy Industries' paper mill was experiencing higher electricity bill and equipment overheating in their production. Quality Energy analysed their power factor profile and found that harmonics in their electrical were causing lagging power factor and overheating.
To resolve the overheating issue and improve the paper mill's lagging power factor, we designed, commissioned and installed custom Quality Energy Power Factor Correction equipment. Harmonics distortion in the electrical system was addressed via the installation of Circutor's Active Harmonic Filter.
The two-pronged approach results in the site receiving clean, uniform power to lower the risk of harmonics and power quality-related outages that will affect the site's productivity.
"I would like to appreciate and thank you for the successful installation and commissioning of the MSP3 PFC panel. As a direct result of this, MSP3 Tx temperature has come down from 105°C to 59°C. "
- Nayab, Electrical & Instrumentation Engineer, VISY Paper Mill 2
Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.
A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business.
Looking to get expert advice? Fill in your details below and we'll get right back to you.
We respect your privacy
Oops, there was an error sending your message.
Please try again
Have a question or comment? Let us know.
Head office – Melbourne
Other Locations
New South Wales
Queensland
South Australia
Tasmania