Warrnambool, Victoria

The Problem



Quality Energy was tasked with improving the power factor of a land rig owned and run by Ensign Energy and temporarily based at a destination on the Surf Coast Shire. 


We discovered that Low Power Factor was limiting the drilling power potential of the rig, resulting in the gen-sets not delivering the maximum power. 


Ensign Energy requested Quality Energy explore an alternative solution to installing another gen-set, which would require high infrastructure and maintenance costs.


 

The Solution

Over the years, Quality Energy has worked on numerous projects in the Oil & Gas sector so we understand the nature of drilling rigs' electrical systems. 


Quality Energy installed 4 x 720kVAr custom built Power Factor Correction Units , to the electrical installation of Rig 754, making up a system totalling 2.88 MVAr. Our PFCs improved the power factor from 0.4-0.5 inductive to the gen-set requirement of 0.7 PF.

Benefits and Outcomes

Key equipment

Quality Energy designed and manufactured Power Factor Correction Units.

System size

4 x 720kVAr Power Factor Correction units

Project warranty

12 Months

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Is your business suffering from unexplained electrical faults, failures or power spikes?

A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business. 

Contact us
Share by:
..... ..... .....
..... ..... .....
...... ......