This Melbourne CBD building presented more twists and turns than The Amazing Race, but our team rose to the challenge, installing a sleek new solar PV system across two levels at the top. Completed just in time for the peak summer season, the system is set to harness maximum renewable energy and deliver significant savings on electricity costs and carbon emissions.
Our partner's client's site had an overheating switchboard and was operating outside the local electrical code. After monitoring the site's power quality and reviewing the data carefully, Quality Energy recommended a 400kVAr Modular Power Factor Correction unit to improve power factor and a 600A Active Harmonic Filter to reduce harmonics. Click on Read More below to view project outcomes and impact.
In addition to improving their energy efficiency with one of our Power Factor Correction units, Sancell wanted to boost their environmental impact and strengthen their sustainability targets so approached us for a renewable energy solution. The result? A stunning 660kW solar PV system using 440W Risen Energy N-Type panels and Sungrow inverters with an extended 25-year warranty.
Quality Energy was delighted to be recommended by The Energy Alliance to partner with Explore & Develop Baulkham Hills for a solar PV solution aimed at reducing electricity costs and cutting carbon emissions. Our team installed a system designed to maximize roof space and deliver the highest possible savings on their electricity bills. With an estimated annual solar production of 34,752 kWh, Explore & Develop Baulkham Hills is set to save 53% on energy costs and prevent 24.3 Tonnes of COâ‚‚ emissions annually — equivalent to planting 401 seedlings and nurturing them over a decade. The future just got a little brighter for the preschoolers and their generation!
This beautiful solar system is producing more renewable energy that estimated. For over 5 years, the Caroline Springs College has had the benefit of over 63MWh generated and our calculations show it has saved them a total of 440 Tonnes of CO2 (equivalent to 7,277 tree seedlings grown for 10 years) and approximately $75k!
After an electricity retailer identified their customer had poor power factor, they approached Quality Energy for a solution. Quality Energy discovered that an existing aged power factor correction unit was in poor condition and not performing as expected, resulting in high demand charges for the Queensland manufacturer. Quality Energy obtained data for analysis and delivered and installed a new, bespoke Power Factor Correction unit. The manufacturer now has a power factor of .99!
EnergyAustralia is currently in the process of installing EV chargers throughout Australia, encouraging use of electric vehicles and providing convenient and easy access to charging stations. As owners of the Newport Power Station, they recently installed an electric vehicle charger on the site for its employees to charge their electric vehicles.
A residential aged care facility with equipment creating harmonics in the power supply needed a solution quickly. Quality Energy, as a leader in manufacturing and installing power quality equipment, were engaged to build a 175kVAr Static Var Generator for our partners to install.
Moana Heights Shopping Centre and Gawler Homemaker Centre wanted to provide customers with the convenience of being able to park and charge their electric vehicles whilst using their facilities. The 120kW twin plug DC EV chargers provide dual charging to attract more customers and additional revenue from customers using the chargers, while reducing fossil fuel carbon emissions.
Bridgestone Select Tyre & Auto have a store, a workshop and a warehouse at their site in Truganina. An old solar PV system on the warehouse rooftop was damaged by a storm and needed to be replaced, so Quality Energy installed a new 99.6kW commercial solar system. This new system is expected to produce 116,713kWH of clean, green electricity in the first year of operation, offsetting 81.5 Tonnes of CO2 emissions, equivalent to 1,248 tree seedlings grown for 10 years.
Highpoint Shopping Center has over 450 different businesses sharing a heating, ventilation and air conditioning (HVAC) system. Newly installed chillers were creating harmonics in Highpoint's electrical system, which can potentially cause equipment malfunction, overheating and hardware damage, as well as taking the electrical system outside of the electrical network code. Quality Energy were engaged to customise a solution using Active Harmonic Filters to reduce harmonics to acceptable levels.
Advanced textile manufacturing is an energy-intensive process and rising energy costs were impacting Australian Textile Mills (ATM). Quality Energy designed and installed a whopping 1MW solar PV system on their heritage listed facility in Wangaratta, Victoria. It's estimated annual production is 1313MWh and will offset 1011 Tonnes of carbon emissions.
Our large electricity retailer channel partner identified Austech Wire and Cable had poor power factor and engaged Quality Energy to provide a solution. Quality Energy carefully considered the structures and surroundings, including a lack of spare circuit breakers/space in the switchboard, and two Power Factor Correction units, one 500kVAR and one 200kVAR, were designed and engineered for each transformer and installed. The results include better protection for their equipment and reduced demand, providing lower electricity bills and carbon emission savings.
The world's leading manufacturer of high-quality chocolate and cocoa products, Barry Callebaut, was looking for a reliable solution to improve their energy efficiency, reduce their electricity bills, become more environmentally responsible and bolster their sustainability positioning at its chocolate factory in Campbellfield. Quality Energy installed a 568kW solar PV system and a 175kVAR Power Factor Correction Unit to reduce the site's energy consumption.
This beautiful bayside residential complex is now even more sustainable! The new 90.2kW solar PV system, customised specifically to withstand inclement weather and sea-salt erosion and installed on one uniquely shaped eleven level main building and two three level low rise townhouses, now powers many of the common areas as well as the de-salination plant that provides water to the gardens and pool.
Quality Energy installed a 99kW solar PV system for McMillan Distributors, reducing their energy costs and improving efficiency while enhancing their environmental sustainability.
The IGA store in Bungendore hired Quality Energy to install a 152kW solar PV system after being impressed with our work at neighbouring Cellarbrations. In addition to the installation, Quality Energy provided project management assistance to maximise financial benefits and efficiency for the client.
David Moss Corporation's Geebung manufacturing plant has been facing a significant issue of harmonic pollution, which has resulted in high power bills for the business due to a low power factor. Quality Energy custom-built and installed 1700kVAr Power Factor Correction solution to improve power factor and increase cost and productivity efficiency.
Quality Energy installed a 25kW EV charger at Western Program Alliance's office in Footscray, Victoria for their pool vehicles, as part of WPA's sustainability strategy to electrify their fleet vehicles.
Service stations such as Budget Petrol in Goulburn are increasing their investment in EV chargers in preparation for a reduced global demand for fossil fuels. Quality Energy installed a rooftop-mounted solar power system to help the customer achieve energy autonomy by improving their power supply and reducing their tariff charges.
Quality Energy installed a 37kW solar panel system for award-winning pie and baked goods Country Cob Bakery, which was looking for a clean energy source to power its manufacturing operations.
Kellogg's Australia is a large energy user with expensive commercial electricity contracts. As cost of production increase and a commitment to be more energy efficient, Kellogg's Australia engaged Quality Energy to explore how to reduce their electricity demand charges while optimising their production's electrical environment.
Quality Energy has been helping Arctic Ice's Australian sites to maximise their energy efficiency via our custom Power Factor Correction solutions. We integrate a Solar Power system with Power Factor Correction at their Victorian site to help Arctic Ice reduce their carbon footprint, as well as any excess demand charges.
Quality Energy has been supporting Visy Industries to reduce their electrical demand (kVA) for over 20 years. They were experiencing higher electricity bill and equipment overheating in their production and contacted Quality Energy to design a solution.
Quality Energy was awarded the project to install four EV chargers at IKEA in Marsden Park, NSW, in support of the world-famous flat-pack furniture brand's strong commitment to being climate-positive, reducing more greenhouse gas emissions than what the entire business emits.
Quality Energy was contacted by Sydney's Sutherland Shire Council to install two EV chargers at the Council car park in Sutherland, NSW as part of their commitment to achieving carbon neutrality by 2030 with respect to the Council's own operations.
Quality Energy analysed Mercedes-Benz Australia's power profile at their national parts warehouse and overlaid that with their energy spend to help design the most cost-effective and high-performance solar power solution for their operations.
Quality Energy was engaged to design and manufacture a Power Factor Correction system for Covino Farms to improve their Power Factor and reduce their electricity bill. The proposed solution would need to fit in a tight space and withstand heat stress.
Quality Energy supported Laminex’s landlord to deliver energy efficiency upgrades for their tenant to reduce running cost and retain their tenant.
Quality Energy resolved the harmonic pollution issue for Jalna which is causing unplanned production shutdowns.
Quality Energy reduced the harmonic pollution that was interfering with sensitive medical imaging equipment, so Flinders Private Hospital can continue their critical lifesaving work.
Quality Energy improved Newscorp’s Power Factor as a response to their electricity provider’s change in demand tariffs which increased their energy cost.
Quality Energy detected and resolved harmonic interference that was disrupting the hospital's ECG test result.
Quality Energy helped Emerging IT take control of their electricity spend and uncertain wholesale electricity prices through solar PV installations.
Quality Energy was given the task of improving the power factor of a land rig, which required more drilling power than the generators installed could provide.
Quality Energy helped Rialto Towers improve their Power Quality to meet the Energy Authority regulations and reduce unplanned lift outages.
Quality Energy analysed the energy use profile and detected excess energy demand which is placing unnecessary demand charges.
A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business.
Have a question or comment? Let us know.
Head office – Melbourne
Other Locations
New South Wales
Queensland
South Australia
Tasmania