Bedford Park, South Australia

The Problem


Flinders Private Hospital contacted Quality Energy to investigate a harmonic pollution issue that was causing critical hospital equipment to shut down.

The Solution

Quality Energy team conducted an in-depth power quality study and installed a 400Amp Active Harmonic Filter. Despite the urgency of this project, Quality Energy were able to deliver the project in a timely manner because we assemble our systems locally.

Benefits and Outcomes

Key equipment

Circutor Active Harmonic Filter AFQm-4W-400C

System size

1x 400Amp Active Harmonic Filter

Project warranty

2 Years

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Is your business suffering from unexplained electrical faults, failures or power spikes?

A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business. 

Contact us
Share by: