Evanston, South Australia

The Problem


The busy shopping centre location meant an additional challenge of having to ensure scheduled power outages happened outside of business hours. This reduces disruptions to existing services and the centre's operation.

The Solution

Quality Energy installed a high-efficiency 120kW three-phase EV charger and an accompanying switchboard for Gawler shopping centre. Hydro excavation was also preferred to minimise damage to existing services, and MSB work was completed outside of business hours. 

Benefits and Outcomes

Key equipment

  • ABB 120kW Electric Vehicle Charger
  • Civil works
  • Switchboard

System size

120kW three-phase EV charger

Project warranty

Workmanship warranty: 2 years

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Is your business suffering from unexplained electrical faults, failures or power spikes?

A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business. 

Contact us
Share by: