Laverton North, Victoria

The Problem


Concerns about long-term environmental impact meant that Mercedes-Benz Australia needed solutions to offset carbon emissions and improve energy efficiency.

The Solution

Quality Energy analysed Mercedes-Benz Australia's power profile at their national parts warehouse and overlaid that with their energy spend to help design the most cost-effective and high-performance solar power solution for their operations.

Benefits and Outcomes

Key equipment

  • Sungrow Solar Invertor 110kW, 3-Phase 9 MPPT (w/ WiFi, DC Cover, DC Switch Built-In)
  • 270 x Ulica Panels 370W

System size

99.9kW

Project warranty

  • Workmanship 10 years
  • Framing 10 years
  • Solar Inverter 10 years
  • Panel 15 years
  • Solar Power Output 25 years

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Is your business suffering from unexplained electrical faults, failures or power spikes?

A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business. 

Contact us
Share by: