Moana, South Australia

The Problem


This project faced challenges due to the busy shopping centre location. Any scheduled power outages had to be managed around operating hours to minimise downtime and disruption to the shopping centre's operation. 

The Solution

Quality Energy installed a 120kW EV charger and a distribution board to manage the additional load efficiently. Electrical work on the main switchboard was done outside of business hours to ensure the power outage doesn't affect business. The hydro excavation was done to reduce damage to existing services.

Benefits and Outcomes

Key equipment

  • ABB 120kW 3-phase EV charger
  • Installation of Chargefox switchboard
  • Electrical works
  • Civil works

System size

120kW

Project warranty

Workmanship Warranty: 2 years

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Is your business suffering from unexplained electrical faults, failures or power spikes?

A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business. 

Contact us
Share by: