Yarraville, Victoria
Yarraville, Victoria
Sugar Australia's energy provider and on-site engineers identified the equipment used for processing sugar, including refining and packaging, was causing the company to have poor power factor, resulting in high demand charges on their electricity bills.
Sugar Australia contacted Quality Energy to provide a solution to reduce demand charges and ensure compliance. The large, complex and ageing site required extensive testing and critical upgrades to enable the installation of our equipment. Additionally, as the site operates 24 hours a day, meticulous planning around shutdowns was essential to ensure minimal disruption.
As the site is fed from a high-voltage network, it was proposed that multiple low-voltage Power Factor Correction (PFC) units be installed at various locations around the site, specifically at their 11kV/415V transformers.
A 500kVAr and 2 x 250kVAr standard Power Factor Correction (PFC) systems were proposed, along with a 750kVAr Static Var Generator (SVG) to address the fast-acting nature of the electrical loads on one of their Main Switchboards (MSBs).
By installing the proposed equipment, we successfully improved Sugar Australia's overall Power Factor from 0.83 to 0.98. This significantly reduced their overall kVA demand, decreasing the total load on their electrical system, resulting in a substantial impact on lowering their electricity costs and creating capacity for additional equipment to be installed in the future without the risk of overloading the system.
Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.
A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business.