Brisbane Print Centre

The Problem


Newscorp’s Brisbane Print Centre had their tariff changed which meant that Energex started penalising them for having a poor power factor.

The Solution

After analysing Newcorp's electricity usage and charges, our engineers determined they required over 3,500 kVAr of capacitor banks over six substations to achieve the ideal Power Factor that could maximise their electricity savings.

Benefits and Outcomes

Key equipment

Quality Energy designed and manufactured Low Voltage Power Factor Correction Systems

System size

3,500 kVAr Power Factor Correction

Project warranty

3 Years

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Is your business suffering from unexplained electrical faults, failures or power spikes?

A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business. 

Contact us
Share by: